wt.projmgmt.msproject
Class MsProjectException

java.lang.Object
  extended byjava.lang.Throwable
      extended byjava.lang.Exception
          extended bywt.util.WTException
              extended bywt.projmgmt.msproject.MsProjectException
All Implemented Interfaces:
LocalizableMessage, Message, Serializable

public class MsProjectException
extends WTException
implements Serializable

A specialization of WTException for exceptions that occur during MsProject import or export.

Supported API: false

Extendable: false

See Also:
Serialized Form

Field Summary
private static String CLASSNAME
           
private static String RESOURCE
           
 
Fields inherited from class wt.util.WTException
GETMESSAGE_LINE_SEPARATOR, LINE_SEPARATOR, SPACE_SEPARATOR, TOSTRING_LINE_SEPARATOR
 
Fields inherited from class java.lang.Exception
 
Fields inherited from class java.lang.Throwable
 
Constructor Summary
MsProjectException()
          Constructs a MsProject exception with no specified detailed message or embedded throwable object.
MsProjectException(String rb, String key, Object[] params)
          Constructs a MsProject exception with a localizable detailed message.
MsProjectException(Throwable t)
          Constructs a MsProject exception with an embedded Throwable object.
MsProjectException(Throwable t, String rb, String key, Object[] params)
          Constructs a MsProject exception with an embedded Throwable object and a localizable detailed message

Supported API: false
 
Methods inherited from class wt.util.WTException
getAdditionalMessageArray, getAdditionalMessages, getAdditionalMessages, getLocalizedMessage, getLocalizedMessage, getLocalizedMessage, getLocalizedMessage, getNestedExceptionString, getNestedExceptionString, getNestedThrowable, getStandardMessage, getStandardMessage, printStackTrace, printStackTrace, printStackTrace, setLocalizedMessage, toString, toString
 
Methods inherited from class java.lang.Throwable
fillInStackTrace, getCause, getMessage, getStackTrace, initCause, setStackTrace
 
Methods inherited from class java.lang.Object
clone, equals, finalize, getClass, hashCode, notify, notifyAll, wait, wait, wait
 

Field Detail

RESOURCE

private static final String RESOURCE
See Also:
Constant Field Values

CLASSNAME

private static final String CLASSNAME
Constructor Detail

MsProjectException

public MsProjectException()
Constructs a MsProject exception with no specified detailed message or embedded throwable object.

Supported API: false


MsProjectException

public MsProjectException(String rb,
                          String key,
                          Object[] params)
Constructs a MsProject exception with a localizable detailed message.

Supported API: false

Parameters:
rb - the name of the base resource bundle subclass containing the localizable message
key - the key associated with the localizable message
params - an optional set of objects to be formatted into the localizable message text

MsProjectException

public MsProjectException(Throwable t,
                          String rb,
                          String key,
                          Object[] params)
Constructs a MsProject exception with an embedded Throwable object and a localizable detailed message

Supported API: false

Parameters:
t - the embedded Throwable. It may be null.
rb - the name of the base resource bundle subclass containing the localizable message
key - the key associated with the localizable message
params - an optional set of objects to be formatted into the localizable message text

MsProjectException

public MsProjectException(Throwable t)
Constructs a MsProject exception with an embedded Throwable object.

Supported API: false

Parameters:
t - the embedded Throwable. It may be null.