wt.projmgmt.msproject
Class MsProjectHelper

java.lang.Object
  extended bywt.projmgmt.msproject.MsProjectHelper
All Implemented Interfaces:
Externalizable, Serializable

public class MsProjectHelper
extends Object
implements Externalizable

This helper class provides access to the MsProjectService implementation. It also provides some useful utilities for working with the Microsoft Project Integration features of Windchill.

Supported API: false

Extendable: false

See Also:
Serialized Form

Field Summary
private static String CLASSNAME
           
static long EXTERNALIZATION_VERSION_UID
           
protected static long OLD_FORMAT_VERSION_UID
           
private static String RESOURCE
           
(package private) static long serialVersionUID
           
static MsProjectService service
          

Supported API: false
 
Constructor Summary
MsProjectHelper()
           
 
Method Summary
 void readExternal(ObjectInput input)
          Reads the non-transient fields of this class from an external source.
private  boolean readOldVersion(ObjectInput input, long readSerialVersionUID, boolean passThrough, boolean superDone)
          Reads the non-transient fields of this class from an external source, which is not the current version.
protected  boolean readVersion(MsProjectHelper thisObject, ObjectInput input, long readSerialVersionUID, boolean passThrough, boolean superDone)
          Reads the non-transient fields of this class from an external source.
 void writeExternal(ObjectOutput output)
          Writes the non-transient fields of this class to an external source.
 
Methods inherited from class java.lang.Object
clone, equals, finalize, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait
 

Field Detail

RESOURCE

private static final String RESOURCE
See Also:
Constant Field Values

CLASSNAME

private static final String CLASSNAME

service

public static final MsProjectService service


Supported API: false


serialVersionUID

static final long serialVersionUID
See Also:
Constant Field Values

EXTERNALIZATION_VERSION_UID

public static final long EXTERNALIZATION_VERSION_UID
See Also:
Constant Field Values

OLD_FORMAT_VERSION_UID

protected static final long OLD_FORMAT_VERSION_UID
See Also:
Constant Field Values
Constructor Detail

MsProjectHelper

public MsProjectHelper()
Method Detail

writeExternal

public void writeExternal(ObjectOutput output)
                   throws IOException
Writes the non-transient fields of this class to an external source.

Supported API: false

Specified by:
writeExternal in interface Externalizable
Parameters:
output -
Throws:
IOException

readExternal

public void readExternal(ObjectInput input)
                  throws IOException,
                         ClassNotFoundException
Reads the non-transient fields of this class from an external source.

Supported API: false

Specified by:
readExternal in interface Externalizable
Parameters:
input -
Throws:
IOException
ClassNotFoundException

readVersion

protected boolean readVersion(MsProjectHelper thisObject,
                              ObjectInput input,
                              long readSerialVersionUID,
                              boolean passThrough,
                              boolean superDone)
                       throws IOException,
                              ClassNotFoundException
Reads the non-transient fields of this class from an external source.

Supported API: false

Parameters:
thisObject -
input -
readSerialVersionUID -
passThrough -
superDone -
Returns:
boolean
Throws:
IOException
ClassNotFoundException

readOldVersion

private boolean readOldVersion(ObjectInput input,
                               long readSerialVersionUID,
                               boolean passThrough,
                               boolean superDone)
                        throws IOException,
                               ClassNotFoundException
Reads the non-transient fields of this class from an external source, which is not the current version.

Parameters:
input -
readSerialVersionUID -
passThrough -
superDone -
Returns:
boolean
Throws:
IOException
ClassNotFoundException