wt.projmgmt.msproject
Class DefaultSAXContentHandler

java.lang.Object
  extended bywt.projmgmt.msproject.DefaultSAXContentHandler
All Implemented Interfaces:
ContentHandler
Direct Known Subclasses:
ChildContentHandler, PlanContentHandler

public class DefaultSAXContentHandler
extends Object
implements ContentHandler

A default implementation of ContentHandler.


Constructor Summary
DefaultSAXContentHandler()
           
 
Method Summary
 void characters(char[] ch, int start, int length)
           
 void endDocument()
           
 void endElement(String namespaceURL, String localName, String qName)
           
 void endPrefixMapping(String prefix)
           
 void ignorableWhitespace(char[] ch, int start, int length)
           
protected  void outputEndElement(String namespaceURL, String localName, String qName)
          Output the element end tag.
protected  void outputStartElement(String namespaceURL, String localName, String qName, Attributes atts)
          Output the element start tag.
 void processingInstruction(String target, String data)
           
 void setDocumentLocator(Locator locator)
           
 void skippedEntity(String name)
           
 void startDocument()
           
 void startElement(String namespaceURL, String localName, String qName, Attributes atts)
           
 void startPrefixMapping(String prefix, String uri)
           
 
Methods inherited from class java.lang.Object
clone, equals, finalize, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait
 

Constructor Detail

DefaultSAXContentHandler

public DefaultSAXContentHandler()
Method Detail

startElement

public void startElement(String namespaceURL,
                         String localName,
                         String qName,
                         Attributes atts)
                  throws SAXException
Specified by:
startElement in interface ContentHandler
Throws:
SAXException

characters

public void characters(char[] ch,
                       int start,
                       int length)
                throws SAXException
Specified by:
characters in interface ContentHandler
Throws:
SAXException

endElement

public void endElement(String namespaceURL,
                       String localName,
                       String qName)
                throws SAXException
Specified by:
endElement in interface ContentHandler
Throws:
SAXException

endDocument

public void endDocument()
                 throws SAXException
Specified by:
endDocument in interface ContentHandler
Throws:
SAXException

endPrefixMapping

public void endPrefixMapping(String prefix)
                      throws SAXException
Specified by:
endPrefixMapping in interface ContentHandler
Throws:
SAXException

ignorableWhitespace

public void ignorableWhitespace(char[] ch,
                                int start,
                                int length)
                         throws SAXException
Specified by:
ignorableWhitespace in interface ContentHandler
Throws:
SAXException

processingInstruction

public void processingInstruction(String target,
                                  String data)
                           throws SAXException
Specified by:
processingInstruction in interface ContentHandler
Throws:
SAXException

setDocumentLocator

public void setDocumentLocator(Locator locator)
Specified by:
setDocumentLocator in interface ContentHandler

skippedEntity

public void skippedEntity(String name)
                   throws SAXException
Specified by:
skippedEntity in interface ContentHandler
Throws:
SAXException

startDocument

public void startDocument()
                   throws SAXException
Specified by:
startDocument in interface ContentHandler
Throws:
SAXException

startPrefixMapping

public void startPrefixMapping(String prefix,
                               String uri)
                        throws SAXException
Specified by:
startPrefixMapping in interface ContentHandler
Throws:
SAXException

outputStartElement

protected void outputStartElement(String namespaceURL,
                                  String localName,
                                  String qName,
                                  Attributes atts)
Output the element start tag.


outputEndElement

protected void outputEndElement(String namespaceURL,
                                String localName,
                                String qName)
Output the element end tag.