wt.projmgmt.msproject
Class ExportInfo

java.lang.Object
  extended bywt.projmgmt.msproject.ImportExportInfo
      extended bywt.projmgmt.msproject.ExportInfo
All Implemented Interfaces:
Externalizable, Serializable

public class ExportInfo
extends ImportExportInfo
implements Externalizable

This class aggregates information that is used to control the behavior of Microsoft Project Plan exporting.

Supported API: false

Extendable: false

See Also:
Serialized Form

Field Summary
private static String CLASSNAME
           
private  boolean edit
           
static long EXTERNALIZATION_VERSION_UID
           
protected static long OLD_FORMAT_VERSION_UID
           
private static String RESOURCE
           
(package private) static long serialVersionUID
           
 
Fields inherited from class wt.projmgmt.msproject.ImportExportInfo
 
Constructor Summary
ExportInfo()
           
 
Method Summary
 boolean isEdit()
          Gets the value of the attribute: edit; the flag that indicates whether information should be exported that allows a client to edit the data and import it back into the plan

Supported API: false
 void readExternal(ObjectInput input)
          Reads the non-transient fields of this class from an external source.
private  boolean readOldVersion(ObjectInput input, long readSerialVersionUID, boolean passThrough, boolean superDone)
          Reads the non-transient fields of this class from an external source, which is not the current version.
protected  boolean readVersion(ExportInfo thisObject, ObjectInput input, long readSerialVersionUID, boolean passThrough, boolean superDone)
          Reads the non-transient fields of this class from an external source.
 void setEdit(boolean a_Edit)
          Sets the value of the attribute: edit; the flag that indicates whether information should be exported that allows a client to edit the data and import it back into the plan

Supported API: false
 void writeExternal(ObjectOutput output)
          Writes the non-transient fields of this class to an external source.
 
Methods inherited from class wt.projmgmt.msproject.ImportExportInfo
getEncoding, getImportAction, getLocale, getTaskScope, getTimeZone, isIncludeDependencies, isIncludeResources, isIncludeTasks, isIncludeTimeZone, isProvideFeedback, readVersion, setEncoding, setImportAction, setIncludeDependencies, setIncludeResources, setIncludeTasks, setIncludeTimeZone, setLocale, setProvideFeedback, setTaskScope, setTimeZone
 
Methods inherited from class java.lang.Object
clone, equals, finalize, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait
 

Field Detail

RESOURCE

private static final String RESOURCE
See Also:
Constant Field Values

CLASSNAME

private static final String CLASSNAME

edit

private boolean edit

serialVersionUID

static final long serialVersionUID
See Also:
Constant Field Values

EXTERNALIZATION_VERSION_UID

public static final long EXTERNALIZATION_VERSION_UID
See Also:
Constant Field Values

OLD_FORMAT_VERSION_UID

protected static final long OLD_FORMAT_VERSION_UID
See Also:
Constant Field Values
Constructor Detail

ExportInfo

public ExportInfo()
Method Detail

writeExternal

public void writeExternal(ObjectOutput output)
                   throws IOException
Writes the non-transient fields of this class to an external source.

Supported API: false

Specified by:
writeExternal in interface Externalizable
Overrides:
writeExternal in class ImportExportInfo
Parameters:
output -
Throws:
IOException

readExternal

public void readExternal(ObjectInput input)
                  throws IOException,
                         ClassNotFoundException
Reads the non-transient fields of this class from an external source.

Supported API: false

Specified by:
readExternal in interface Externalizable
Overrides:
readExternal in class ImportExportInfo
Parameters:
input -
Throws:
IOException
ClassNotFoundException

readVersion

protected boolean readVersion(ExportInfo thisObject,
                              ObjectInput input,
                              long readSerialVersionUID,
                              boolean passThrough,
                              boolean superDone)
                       throws IOException,
                              ClassNotFoundException
Reads the non-transient fields of this class from an external source.

Supported API: false

Parameters:
thisObject -
input -
readSerialVersionUID -
passThrough -
superDone -
Returns:
boolean
Throws:
IOException
ClassNotFoundException

readOldVersion

private boolean readOldVersion(ObjectInput input,
                               long readSerialVersionUID,
                               boolean passThrough,
                               boolean superDone)
                        throws IOException,
                               ClassNotFoundException
Reads the non-transient fields of this class from an external source, which is not the current version.

Parameters:
input -
readSerialVersionUID -
passThrough -
superDone -
Returns:
boolean
Throws:
IOException
ClassNotFoundException

isEdit

public boolean isEdit()
Gets the value of the attribute: edit; the flag that indicates whether information should be exported that allows a client to edit the data and import it back into the plan

Supported API: false

Returns:
boolean

setEdit

public void setEdit(boolean a_Edit)
Sets the value of the attribute: edit; the flag that indicates whether information should be exported that allows a client to edit the data and import it back into the plan

Supported API: false

Parameters:
a_Edit -