|
|||||||||||
PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||||
SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD |
java.lang.Objectwt.projmgmt.msproject.MsProjectHelper
This helper class provides access to the MsProjectService
implementation. It also provides some useful utilities for working with
the Microsoft Project Integration
features of Windchill
.
Supported API: false
Extendable: false
Field Summary | |
private static String |
CLASSNAME
|
static long |
EXTERNALIZATION_VERSION_UID
|
protected static long |
OLD_FORMAT_VERSION_UID
|
private static String |
RESOURCE
|
(package private) static long |
serialVersionUID
|
static MsProjectService |
service
Supported API: false |
Constructor Summary | |
MsProjectHelper()
|
Method Summary | |
void |
readExternal(ObjectInput input)
Reads the non-transient fields of this class from an external source. |
private boolean |
readOldVersion(ObjectInput input,
long readSerialVersionUID,
boolean passThrough,
boolean superDone)
Reads the non-transient fields of this class from an external source, which is not the current version. |
protected boolean |
readVersion(MsProjectHelper thisObject,
ObjectInput input,
long readSerialVersionUID,
boolean passThrough,
boolean superDone)
Reads the non-transient fields of this class from an external source. |
void |
writeExternal(ObjectOutput output)
Writes the non-transient fields of this class to an external source. |
Methods inherited from class java.lang.Object |
clone, equals, finalize, getClass, hashCode, notify, notifyAll, toString, wait, wait, wait |
Field Detail |
private static final String RESOURCE
private static final String CLASSNAME
public static final MsProjectService service
static final long serialVersionUID
public static final long EXTERNALIZATION_VERSION_UID
protected static final long OLD_FORMAT_VERSION_UID
Constructor Detail |
public MsProjectHelper()
Method Detail |
public void writeExternal(ObjectOutput output) throws IOException
writeExternal
in interface Externalizable
output
-
IOException
public void readExternal(ObjectInput input) throws IOException, ClassNotFoundException
readExternal
in interface Externalizable
input
-
IOException
ClassNotFoundException
protected boolean readVersion(MsProjectHelper thisObject, ObjectInput input, long readSerialVersionUID, boolean passThrough, boolean superDone) throws IOException, ClassNotFoundException
thisObject
- input
- readSerialVersionUID
- passThrough
- superDone
-
IOException
ClassNotFoundException
private boolean readOldVersion(ObjectInput input, long readSerialVersionUID, boolean passThrough, boolean superDone) throws IOException, ClassNotFoundException
input
- readSerialVersionUID
- passThrough
- superDone
-
IOException
ClassNotFoundException
|
|||||||||||
PREV CLASS NEXT CLASS | FRAMES NO FRAMES | ||||||||||
SUMMARY: NESTED | FIELD | CONSTR | METHOD | DETAIL: FIELD | CONSTR | METHOD |